# Community Compute & Energy Park Ordinance

> **Code:** Model 03 | **Updated:** 2026-11-24 | **Web Brief:** https://familyflourishing.org/ordinance/community-compute-park.html | **2-Page Print PDF:** https://familyflourishing.org/ordinance/pdfs/community-compute-park-brief.pdf
> **LLM Adaptation Prompt:** Adapt this model municipal ordinance to [My City, State]'s municipal code. Verify Home Rule vs. Dillon's Rule authority, flag any state preemption statutes, fill in the [bracketed parameters] using the city-size preset table below, and add the city's verbatim charter enacting clause.

## Executive Summary
- **What it does:** Replaces secretive industrial data centers with a pre-mapped Compute-Energy Overlay: ring-fenced grid tariffs, household electric credits, closed-loop cooling, and 75-day ministerial permits.
- **Preemption status:** Cities control zoning and municipal utility rates directly. Investor-owned utility tariffs sit with State PUCs.
- **Who can adopt it:** Towns, suburbs, and rural counties fielding hyperscale or AI compute proposals, plus public power utilities and industrial corridor boards.
- **30-second pitch:** Residents reject data centers when they get higher power bills and secret NDAs; builders hate 24-month moratorium fights. This dual-pitch ordinance puts a visible electric-bill credit on every household statement in exchange for 75-day by-right overlay approval.

## Jurisdiction & Preemption Matrix
- **City Unilateral Authority:** Overlay zoning districts, residential/transit buffers, 60-to-90-day ministerial shot clocks, closed-loop cooling caps, Class 1 dBA/dBC acoustic standards, municipal utility large-load tariffs, franchise-fee residential credits, waste-heat stub-outs, and municipal anti-NDA bans.
- **State Enabling / Preemption Check:** Investor-owned utility (IOU) electric rates sit with State Public Utility Commissions (e.g., Dominion GS-5 in VA, AEP Ohio DCT, GA PSC, OR HB 3546 POWER Act). Cities served by IOUs require proof of state-approved large-load cost protection as a zoning condition. Watch state levy caps (e.g., IA SF 2472) and state 'right to compute' preemption bills.
- **Federal Floor & Constitutional Limits:** FERC regulates interstate wholesale transmission; municipal electric utilities must also observe IRS tax-exempt bond private-use rules (APPA 2026 guidance) when structuring dedicated substation financing. Backup diesel generators must satisfy EPA / state Clean Air permits.

## Pre-Resolved Local Parameter Presets
| Parameter | Small Town (<15k) | Mid-Size City (15k-100k) | Metro (>100k) |
| :--- | :--- | :--- | :--- |
| `[Large-Load Threshold]` | >= 10 MW | >= 20 MW | >= 25 MW |
| `[Residential / School Buffer]` | 1,000 ft | 1,500 ft | 2,640 ft (Atlanta model) |
| `[Overlay Shot Clock]` | 60 calendar days | 75 calendar days | 90 calendar days |
| `[Take-or-Pay Tariff Term]` | 12 yr / 85% min demand | 14 yr / 85% min demand | 15 yr / 90% min demand |
| `[Franchise / Bill Credit]` | 3% fee / 35% to bills | 4% fee / 30% to bills | 5% fee / 25% to bills |
| `[Property-Line Sound Cap]` | 50 dBA / 60 dBC | 50 dBA / 58 dBC | 45 dBA / 55 dBC |

## Context & Evidence
Between 2024 and 2026, the old municipal data-center deal collapsed. Unconditional by-right industrial zoning, 20-year tax giveaways, and secretive project NDAs drove $64 billion in blocked or delayed projects from May 2024 to March 2025, climbing past $130 billion per quarter by early 2026 (Data Center Watch). Even Loudoun County, Virginia, which collects over $1 billion a year in data-center revenue, ended by-right siting in March 2025 after Virginia's JLARC audit warned unbuffered load growth could add $14 to $37 a month to ordinary residential electric bills.

Calling a server warehouse an 'innovation campus' while keeping secret NDAs and residential rate risk fools nobody. A durable Community Compute and Energy Park ordinance fixes both halves of the deal at once. Towns get ironclad grid-cost shields, a visible monthly credit on family electric bills, zero evaporative water drain, and heated civic infrastructure. Compute builders get pre-vetted overlay parcels, transparent cost terms, flexible-load tariff credits, and binding 60-to-90-day ministerial permits with genuine local backing.

## Operative Model Ordinance Text

### Article 1. Compute-Energy Overlay & Fast-Track Ministerial Siting (The Builder Pitch) (City Unilateral)
- Section 1.1 Pre-vetted corridor only. Facilities >= [20] MW or >= [25,000] sq ft are removed from general industrial by-right lists and sited inside a council-mapped Compute-Energy Overlay District adjacent to high-voltage substations or brownfields, at least [1,500] feet from residential zones and schools.
- Section 1.2 Binding [75]-day by-right shot clock. Any project inside the Overlay satisfying 100% of Articles 2 through 5 receives ministerial site-plan approval within [75] calendar days with zero discretionary hearing or moratorium delay. Projects outside the Overlay require a Council Special Exception and half-mile resident notice.
- Section 1.3 Anti-speculation & decommissioning. Approvals require a utility willingness-to-serve letter, 24-month construction milestones, and a decommissioning surety bond.
- *Drafting Note:* Synthesizes Loudoun ZOAM-2024-0001, Henrico County (June 2025), and Atlanta Ord. 24-O-1222 while giving compliant builders the permitting speed and certainty that ad hoc moratorium fights destroy.

### Article 2. Ring-Fenced Large-Load Tariff & Direct Household Electric Credit (The Town Pitch) (Muni Utility / PUC Check)
- Section 2.1 Zero ratepayer cross-subsidy. Before building permit issuance, the operator executes a Large-Load Service Agreement (under [City] utility tariff or state PUC docket) locking a [14]-year term, [85]% minimum monthly billing demand, [$1.5M/MW] letter of credit, and 100% upfront Contributions in Aid of Construction (CIAC) for dedicated substations and feeder upgrades.
- Section 2.2 Itemized Community Compute Grid Credit. Any local tax abatement is capped at [10] years and paired with a CPI-indexed PILOT and [4]% utility franchise fee. By ordinance, [30]% of annual franchise/PILOT revenue flows directly onto resident electric bills as an itemized 'Community Compute Credit' and [20]% enters ring-fenced road and park capital reserves.
- Section 2.3 Flexible-load credits. Operators enrolling on-site battery storage or EPRI DCFlex peak-shaving curtailment qualify for codified demand-charge discounts and priority interconnection.
- *Drafting Note:* Combines Dominion Virginia GS-5 (PUR-2025-00058), AEP Ohio Schedule DCT (24-0508-EL-ATA), OPPD Rate 261M, and Prineville, Oregon's ~$12M/year utility franchise model. Check state property-tax levy caps (cf. Iowa SF 2472) before structuring abatements.

### Article 3. Closed-Loop Cooling & Class 1 Acoustic Enforcement (City Unilateral)
- Section 3.1 Zero evaporative water drain. Open-loop evaporative cooling towers are barred in water-stressed basins. Facilities must use closed-loop liquid or air-cooled systems (direct-to-chip or dry coolers), disclose all cooling biocides, and stay under [City]'s Large Water User threshold.
- Section 3.2 Dual dBA and low-frequency dBC caps. All chillers and rooftop plant sit inside fully enclosed acoustic penthouses. Property-line sound may not exceed [50] dBA or [58] dBC tonal limits, verified by independent Class 1 sound-meter audits at commissioning and annually for [5] years.
- Section 3.3 Generator testing & enforcement. Routine backup generator testing is limited to weekday daytime hours (9:00 AM to 4:00 PM). Uncured acoustic violations after 30 days suspend operational certificates.
- *Drafting Note:* Draws on Abilene / Prineville closed-loop cooling, Tucson Ord. 12272 (8,500 CCF/mo water threshold), Prince William County Ch. 14 Class 1 dBA/dBC testing, Chandler Sec. 35-2214 5-year audits, and Cheyenne PLTA-26-5 enclosed penthouses.

### Article 4. Waste-Heat Reuse Stubs, Grid Resilience & Civic Compute (City Unilateral)
- Section 4.1 Thermal-ready boundary stub. Every facility >= 1 MW submits a Waste-Heat Cost-Benefit Analysis and installs insulated heat-exchanger stub-outs at the parcel line (25-35 C air-cooled loops for greenhouses or 50-90 C liquid-cooled loops for municipal pools, district heating, or wastewater digesters).
- Section 4.2 Local critical-facility resilience. Where feasible near civic infrastructure, on-site battery storage or microgrid ties provide emergency islanding backup for one designated municipal water plant, clinic, or emergency shelter.
- Section 4.3 Local school compute grant. A recorded Community Benefit Agreement reserves a modest annual compute or STEM lab grant for local public/charter/microschool families and municipal IT upgrades.
- *Drafting Note:* Anchored in EU Energy Efficiency Directive Art. 26, Germany EnEfG waste-heat reuse rules, Odense (45 MW) and Espoo district heating loops, and NREL/TP-5500-96700 (2025).

### Article 5. Anti-NDA Public Transparency & Severability (City Unilateral)
- Section 5.1 Zero-secret covenant. No [City] official, utility director, or economic-development authority may sign a non-disclosure agreement concealing peak MW load, peak-day water demand, backup generator air permits, or total tax-abatement and PILOT math. Full figures publish [45] days before any Council vote.
- Section 5.2 Conflict and severability. State utility tariffs govern where preemptive. If a court invalidates any section of this ordinance, all remaining overlay, acoustic, water, and transparency rules remain in effect.
- *Drafting Note:* Follows Cheyenne PLTA-26-5 and Maryland Executive Order 01.01.2026.16 banning local data-center secrecy NDAs. Ending secrecy early prevents the public outrage that kills projects right before groundbreaking.

## Fiscal & Staffing Capacity Note
Highly net-positive when ring-fenced correctly: Loudoun County averages ~$26 in tax revenue per $1 of municipal service cost, and Prineville (~11,000 residents) collects roughly $12M/year in franchise fees. Upfront 100% CIAC and $1.5M/MW collateral insulate local taxpayers from stranded substation debt; capping single-sector reliance protects the general fund against hardware depreciation cycles.

## 3-Sentence Email to Your Council Member
**Subject:** 2-page brief: Community Compute Park deal (lower family power bills + clear siting)

Council Member [Last Name],

Communities across the country are fighting over data centers because residents fear higher electric bills and secret NDAs while builders face years of delay. I attached a two-page model ordinance brief that solves both problems: it locks in take-or-pay grid shields, closed-loop cooling, zero NDAs, and an itemized electric-bill credit for every household in exchange for fast, pre-mapped overlay siting. Could our Planning Commission and utility staff review this framework before any large-load application lands on our docket?

Best regards,
[Your Name], [Neighborhood / Street]

## Primary-Source Citations
- **Virginia JLARC (2024); Dominion Energy GS-5 (PUR-2025-00058); AEP Ohio DCT (24-0508-EL-ATA):** Projected residential bill impacts and ring-fenced 12-to-15-year large-load take-or-pay tariffs.
- **Data Center Watch (2025-2026); Loudoun County ZOAM-2024-0001; Atlanta Ord. 24-O-1222:** Documented project blockages ($64B to $130B+/qtr) and repeal of unconditional by-right industrial siting.
- **Prineville, OR Franchise Agreement; Tucson Ord. 12272; Chandler Ord. 5033; Prince William Ch. 14:** Franchise-fee revenue sharing (~$12M/yr), water caps, and Class 1 dBA/dBC acoustic standards.
- **Cheyenne PLTA-26-5 & Maryland EO 01.01.2026.16:** Municipal and state bans on data-center non-disclosure agreements.
- **EPRI DCFlex / Flex MOSAIC (2026); APPA Public Power Framework (Oct. 2026); NREL/TP-5500-96700:** Flexible load curtailment, tax-exempt bond rules, and waste-heat district integration.

---
*Model municipal policy text published by Intergenerational Symbolic Systems for Family Flourishing. Not legal advice; have a licensed municipal attorney verify state preemption and charter enactment rules before adoption.*